Lycoming Housing Authority is requesting IFB for replacement of flooring in two of our high-rise properties located in Williamsport, PA. William Hepburn; 9 floors located at 400 Lycoming Street and Peter Herdic; 7 floors located at SOS Center Street.

Removal of existing flooring, consisting of carpet and VCT. After removal clean as required, vacuum to remove loose material. Skim coat with Ardex, feather finish or equal floor leveler as required per manufactures instructions. Subflooring to be sureply or equal installed per manufactures instructions. All removed flooring and debris on this project to be disposed of by Contractor.

Peter Herdic building to have 4 ¼ “Colonial wood base molding installed. Lycoming Housing to provide paint, contractor responsible for painting and touch up as needed.

William Hepburn, base molding to remain in place with 5/16 x 1/2” top molding as required painted and installed.

Flooring in both facilities to be l<ARN DEAN/ VIRGIN PVC MATERIAL or approved equal. Color/ style chosen by owner from submitted samples, door transitions strips to be Pewter, installation by drilling and nailed, no glue. All employees to follow CDC guidelines during this project.

William Hepburn; Main entrance foyer front to rear, including entrance vestibules. All floors hallways, no laundry rooms, or community room.

Peter Herdic; First floor hallway and entrance way stairwells North and South. All floors hallways and elevator lobby’s to include laundry rooms on floor’s 2, 4, a n d 6.

Please include a deduct for the three laundry rooms in your bid. All measurement to be field verified by bidders